Project Description

  • Client: Pure Pharmacy
  • Architect: Terry Woods Architect
  • Quantity Surveyor: A.V. Cooney
  • Structural Engineer: DFK
  • M&E Consultant: Design and build (By M&E Contractors)

Category B fit-out construction of 2nr shell and core units on the 1st floor of the live Frascati Shopping Centre, Blackrock, Co. Dublin. The 2 units consisted of a large medical centre for Centric Healthcare and a pharmacy for Pure. New acoustic walls, acoustic ceilings, vinyl floors, oak timber skirtings, architrave and door sets, grid ceilings, painted finish to skimmed walls and fitted furniture throughout.

Services included power, data, nurse call, access control, cctv, lighitng, emg lighting, fire alarms, intruder alarms, hot and cold water, drainage, air conditioning, mech ventilation.